LOCATION

Loch Awe


NAMEPLATE OUTPUT

251 Kw


CAPACITY FACTOR

41%

 

Allt Mor is the sister scheme to Allt na Dail Fearna, with 1.2km of pipeline feeding a pelton turbine from a single intake 171m above.  The site was identified in 2012 and leased from the landowner by Wemyss Renewables in 2013, achieving consents the same year. Construction began in 2016 and was completed in 2017 at the same time as the Allt na Dail Fearna scheme. With an intake high on the hillside, powerhouse nestled in a hollow and access tracks fully reinstated, the scheme is hidden from most vantage points.